CCISD Transportation Facility
A PROJECT BY The Mitchell Group
Category
Education
Location
COPPERAS COVE, TX
Size
11,017 SF
Completion Date
Aug 2018
SUMMARY
COPPERAS COVE, TX, U.S. – Copperas Cove ISD (CCISD) opened a new, state of the art transportation facility in August 2018. Mitchell Construction began construction on the bonded education project on October 1st, 2017 and completed construction on August 1st, 2018. CCISD was thrilled to have the space ready in time for the 2018 – 2019 school year. The project involved erecting a pre-engineered metal building that totaled 11,017 SF, as well as significant steel construction. Mitchell Construction managed the building, site, and finish out for the project, which spanned 10.5 acres of land. The project was contracted at 4.24 million dollars and was completed under budget at a total cost of 4.14 million dollars. Architects Keith Bailey and Richard Morgan with RBDR PLLC crafted the plans for the space. Several engineering firms contributed to the safety and integrity of the facility. These include Walker Partners as civil engineer consultants, Hart, Gaugler & Associates, Inc. as structural engineer consultants, and Purdy-McGuire as MEP engineer consultants. CCISD Superintendent Dr. Joe Burns played an important role as representative of CCISD and ally throughout the construction process.
Project Budget: 4.24 Million